47th BCT Power & Communication Infrastructure, Fort Carson, CO
  • Outstanding CCASS Evaluation
  • Client: USACE Omaha District
  • Zero Lost Time Hours

 

Design-build construction of a substation, communications node, and installation of underground power and communications lines. The scope of work for the substation included:

  • Equipment foundations, concrete vaults, switchgear enclosure foundation, transmission poles and other miscellaneous equipment supports
  • Communications node included a building 40 foot long by 24 foot wide with reinforced underground concrete cable vault with minimum interior dimensions of 10 feet wide by 8 feet high, and associated equipment pads